Project Details
Clients:
Global Industries
Tags:
FactoryEfficiencyLeanOptimization
Date:
2024-11-05
Budget:
$750,000
Location:
Mumbai, India

Project Overview
The project restructured factory layouts to minimize material handling, reduce bottlenecks, and optimize space utilization. The redesign improved productivity and safety.
Goal of the project
The goals for layout optimization were:
- Optimize production workflow
- Reduce waste in material handling
- Improve employee movement and safety
The Problem

Problems faced included:
- Poorly planned layout
- Frequent bottlenecks in production
- Underutilized floor space
The Solutions

Implemented solutions included:
- Redesigned layouts with lean principles
- Introduced digital twin simulations
- Created flexible work zones for adaptability

